Electricity Demand Reduction Scheme

Electrical Load Control Using a PLC

2024-04-30T15:51:50+00:00

Create an electrical demand and load control system to suit your exact needs using the ATLAS Demand Control System and a customised PLC. Our Atlas Demand Control System operates on a predictive basis to control a site's period demand* to a preset limit. This can be useful where the supply transformer capacity is limited or

Electrical Load Control Using a PLC2024-04-30T15:51:50+00:00

The Electricity Demand Reduction Scheme

2024-04-30T15:26:57+00:00

The Electricity Demand Reduction Scheme or EDR Scheme is a UK Government scheme designed to test whether projects to install more energy efficient equipment can deliver lasting reductions in electrical load (kW) at peak times and hence can form a part of the GB Capacity Market. Put another way, can encouraging companies to partake in

The Electricity Demand Reduction Scheme2024-04-30T15:26:57+00:00